Setup Guide

Figure 7. Four-post threaded conguration
System installation
You can mount the system in the 1U front-rack or 1U two-post ush or center
congurations. For the 1U two-post ush or center congurations, slide the system into the
rails in the same manner as the four-post congurations.
The following is an example of a 1U front-rack conguration:
16
Hardware installation