Setup Guide
Two-post ush-mount conguration
NOTE: Your system is not NEBS Earthquake Z4-compliant if you use this installation
method.
1 For this conguration, remove the latch castings from the front side of each ReadyRails
assembly, item 1.
To remove the two screws and latch casting from each front ange ear, on the switch
side of the rail, use a Torx driver. Retain the castings for future rack requirements. It is
not necessary to remove the rear ange castings.
2 Attach one rail to the front post ange with two user-supplied screws, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger
bracket to the post ange with two user-supplied screws, item 3.
4 Repeat this procedure for the second rail.