Setup Guide

1U tool-less conguration
NOTE: Your system is not NEBS Earthquake Z4-compliant if you use the 1U tool-less
square-hole or two-post installation methods.
1 Face the ReadyRails ange ears outward then place the rail between the left and right
vertical posts.
Align and seat the back ange rail pegs in the back vertical post ange. To see how the
pegs appear in both the square and unthreaded round holes, see item 1.
2 Align and seat the front ange pegs in the holes on the front side of the vertical post.
3 Repeat this procedure for the second rail.
4 Pull on the latch release button on each ange ear to remove each rail then unseat each
rail.
Figure 4. 1U tool-less conguration
12
Hardware installation