Install Guide

Luggage tag
The S4048T-ON system has a pull-out tag, known as a luggage tag, on the same side as the PSUs.
Figure 6. S4048T-ON luggage tag
1
Service tag 2 PPID
3 MAC address 4 Express service code
Prerequisites
The following is a list of system components:
NOTE
: For more information, see Site Preparations and S4048T-ON Installation.
S4048T-ON chassis or multiple chassis, if stacking
AC or DC country/regional specic power cables to connect the AC or DC power source to each of the chassis’ AC or DC power
supplies
ReadyRail™ mounting brackets for rack installation
Screws for rack installation
Grounding GND lug, L-bracket, screws for the chassis
Items that are not included:
GND lug and screws for the rack
Ground wire
Crimping tool
Antioxidant compound—Dell EMC recommends NOALOX 4 or equivalent
The S4048T-ON System
11