Install Guide
Table Of Contents
- Dell EMC PowerSwitch S4048T-ON Installation Guide March 2021
- About this guide
- The S4048T-ON System
- Site preparations
- NEBS compliance
- S4048T-ON installation
- Power supplies
- Fans
- Management ports
- Specifications
- Dell EMC support
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
2. Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws, item 2.
3. Repeat this procedure for the second rail.
Figure 12. Two-post center-mount configuration
Four-post threaded configuration
CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in
Step 1.
1. Remove the tool-less latch castings from each end of the ReadyRails assemblies.
Use a Torx driver to remove the two screws from each latch casting. Remove each casting, item 1. Retain the castings for
future rack requirements.
2. Attach the front and rear flanges for each rail to the post flanges with two user-supplied screws at each end, item 2.
Figure 13. Four-post threaded configuration
20
S4048T-ON installation