Install Guide

Align and seat the back flange rail pegs in the back vertical post flange. This illustration shows how the pegs appear in both
the square and unthreaded round holes.
2. Align and seat the front flange pegs in the holes on the front side of the vertical post.
3. Repeat this procedure for the second rail.
4. To remove each rail, pull on the latch release button on each flange ear and unseat each rail.
Figure 10. 1U tool-less configuration
Two-post flush-mount configuration
CAUTION: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1. Remove the tool-less latch castings from the front side of each ReadyRails assembly, item 1.
Use a Torx driver to remove the two screws from each front flange ear on the switch side of the rail. Remove each latch
casting. Retain the castings for future rack requirements. It is not necessary to remove the rear flange castings.
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.
Figure 11. Two-post flush-mount configuration
Two-post center-mount configuration
CAUTION: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
S4048T-ON installation 19