Install Guide

b. 2GND lug
c. 3—Attached ground wire
3. Attach the assembly to the S4048T-ON chassis:
a. Apply the thread-locker compound to the two pan head screws.
b. Attach the GND lug and bracket assembly to the two-hole chassis ground connector nuts on the PSU side. Tighten the
screws to ensure torque between 35 inch/lbs.
Figure 9. S4048T-ON PSU-side ground
a. 1Pan head screws
b. 2L-bracket
CAUTION: Take care not to damage the attached ground wire as you proceed to install the switch.
After you install the switch in the rack, see Ground wire installation.
ReadyRails installation
Use the ReadyRails rack mounting system to easily configure your rack so that you can install your switch.
The ReadyRails system is provided for 1U front-rack and two-post installations. The ReadyRails system includes two separately
packaged rail assemblies and two rails that are shipped attached to the sides of the switch. Install the ReadyRails system
using the 1U tool-less method or one of three possible 1U tooled methodstwo-post flush mount, two-post center mount, or
four-post threaded.
CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use the 1U tool-less square-hole or two-
post installation methods.
CAUTION: Do not use the mounted ReadyRails as a shelf or a workplace.
NOTE: The illustrations in this document are not intended to represent a specific switch.
1U tool-less configuration
NOTE: Your system is not NEBS Earthquake Z4-compliant if you use this method.
1. Face the ReadyRails flange ears outward, place one rail between the left and right vertical posts.
18
S4048T-ON installation