Install Guide
Table Of Contents
- Dell EMC PowerSwitch S4048T-ON Installation Guide March 2021
- About this guide
- The S4048T-ON System
- Site preparations
- NEBS compliance
- S4048T-ON installation
- Power supplies
- Fans
- Management ports
- Specifications
- Dell EMC support
● One 2-hole UL-certified GND lug
● L-bracket
● Two flat head screws to attach the lug to the bracket
● Two pan head screws to attach the assembly to the chassis
Supply the following:
● A wire that complies with your local electrical codes in size and color. The wire is typically 14 AWG colored green or green
with a yellow stripe
● An antioxidant compound—Dell EMC recommends NOALOX 4 or equivalent
● A crimping tool
● A thread-locker compound—Dell EMC recommends Threadlocker Blue 242 or equivalent
1. Attach the end of the ground wire to the GND lug:
a. Coat the bare end of the wire with an antioxidant compound.
b. Insert the end of the wire into the lug.
c. To secure the connect of the wire to the lug, crimp the lug end.
Figure 7. Ground wire and GND lug
a. 1—Ground wire
b. 2—GND lug
2. Apply the thread-locker compound to the two flat head screws, then attach the GND lug to the L-bracket.
Figure 8. Screws, GND lug, and L-bracket assembly
a. 1—Flat head screws
S4048T-ON installation
17