Install Guide
Table Of Contents
- Dell EMC PowerSwitch S4048T-ON Installation Guide March 2021
- About this guide
- The S4048T-ON System
- Site preparations
- NEBS compliance
- S4048T-ON installation
- Power supplies
- Fans
- Management ports
- Specifications
- Dell EMC support
Luggage tag
The S4048T-ON system has a pull-out tag, known as a luggage tag, on the same side as the PSUs.
Figure 6. S4048T-ON luggage tag
1.
Service tag 2. PPID
3. MAC address 4. Express service code
Prerequisites
The following is a list of system components:
NOTE: For more information, see Site Preparations and S4048T-ON Installation.
● S4048T-ON chassis or multiple chassis, if stacking
● AC or DC country/regional specific power cables to connect the AC or DC power source to each of the chassis’ AC or DC
power supplies
● ReadyRail™ mounting brackets for rack installation
● Screws for rack installation
● Grounding GND lug, L-bracket, screws for the chassis
Items that are not included:
● GND lug and screws for the rack
● Ground wire
● Crimping tool
● Antioxidant compound—Dell EMC recommends NOALOX 4 or equivalent
● Thread-locker compound—Dell EMC recommends Threadlocker Blue 242 or equivalent
● #1 and #2 Phillips screwdrivers
● Torx screwdriver
● Copper/fiber cables
Other optional components are:
10
The S4048T-ON System