Service Manual

You must have at least one link connection to each unit of the VLT domain.
Following are the prerequisites for Proxy Gateway LLDP conguration:
You must globally enable LLDP.
You cannot have interface–level LLDP disable commands on the interfaces congured for proxy gateway and you must enable
both transmission and reception.
You must connect both units of the remote VLT domain by the port channel member.
If you connect more than one port to a unit of the remote VLT domain, the connection must be completed by the time you
enable the proxy gateway LLDP.
You cannot have other conicting congurations (for example, you cannot have a static proxy gateway conguration).
Proxy Gateway LLDP conguration might not operate properly if one of the following conditions is true:
Any proxy gateway conguration or LLDP conguration is not working.
LLDP packets fail to reach the remote VLT domain devices (for example, because the system is down, rebooting, or the port
physical link connection is down).
Sample Conguration for a VLT Proxy Gateway
VLT Proxy Gateway
793