Install Guide
Table Of Contents
- S3048-ON Installation Guide January 2019
- About this guide
- The S3048–ON switch
- Site preparations
- NEBS compliance
- Install the S3048–ON
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE Standards
- Agency compliance
- USA Federal Communications Commission Statement
- European Union EMC Directive Conformance Statement
- Japan VCCI Compliance for Class A Equipment
- Korean Certification of Compliance
- Safety Standards and Compliance Agency Certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support

Figure 7. Two-post center-mount conguration
2 Slide the back bracket towards the post. Secure it to the post ange with two user-supplied screws, to item 2.
3 Repeat this procedure for the second rail.
Four-post threaded installation
1 For this conguration, remove the ange ear castings from each end of the ReadyRails assemblies.
To remove the two screws from each ange ear and remove each casting, use a Torx driver, item 1. Retain the castings for future rack
requirements.
Install the S3048–ON
19