Install Guide
Table Of Contents
- S3048-ON Installation Guide January 2019
- About this guide
- The S3048–ON switch
- Site preparations
- NEBS compliance
- Install the S3048–ON
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE Standards
- Agency compliance
- USA Federal Communications Commission Statement
- European Union EMC Directive Conformance Statement
- Japan VCCI Compliance for Class A Equipment
- Korean Certification of Compliance
- Safety Standards and Compliance Agency Certifications
- Electromagnetic compatibility
- Product recycling and disposal
- Dell EMC support

Figure 5. 1U tool-less conguration
2 Align and seat the front ange pegs in the holes on the front side of the vertical post, item 2.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each ange ear and unseat each rail, item 3.
Two-post ush-mount installation
1 For this conguration, remove the castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front ange ear on the switch side of the rail and remove each casting, use a Torx screwdriver.
Retain the castings for future rack requirements. It is not necessary to remove the rear ange castings.
Install the S3048–ON
17