Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1 Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer to item 1
in the following figure.
2 Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws. Refer to item 2 of the following figure.
3 Repeat this procedure for the second rail.
Install the Hardware 9