Setup Guide
Table Of Contents
- About this Guide
- Install the Hardware
- Install the Chassis
- Rack Mounting Safety Considerations
- Rack Mount the Switch
- Installing the Dell ReadyRails System
- Attaching the Ground Cable (Optional)
- Important Points to Remember
- Installing AC Power Supplies
- Installing a Fan Module
- Installing the SFP+ Optics
- Supply Power and Power Up the System
- After Installing the S3048–ON
- Dell Networking OS
- Technical Specifications
Figure 1. 1U Tool-less Configuration
Two-Post Flush-Mount Configuration
To install the Dell ReadyRails system using the two-post flush-mount configuration,
follow these steps.
1 For this configuration, remove the castings from the front side of each
ReadyRails assembly. Refer to item 1 in the following figure. Use a Torx driver to
remove the two screws from each front flange ear (on the switch side of the
rail) and remove each casting. Retain the castings for future rack requirements.
It is not necessary to remove the rear flange castings.
2 Attach one rail to the front post flange with two user-supplied screws. Refer to
item 2 in the following figure.
3 Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. Refer to item
3 in the following figure.
4 Repeat this procedure for the second rail.
Install the Hardware 8