Setup Guide
Table Of Contents
- About this Guide
- Install the Hardware
- Install the Chassis
- Rack Mounting Safety Considerations
- Rack Mount the Switch
- Installing the Dell ReadyRails System
- Attaching the Ground Cable (Optional)
- Important Points to Remember
- Installing AC Power Supplies
- Installing a Fan Module
- Installing the SFP+ Optics
- Supply Power and Power Up the System
- After Installing the S3048–ON
- Dell Networking OS
- Technical Specifications
Parameter Specifications
Maximum operational altitude 10,000 feet (3,048 meters)
Maximum non-operational altitude No performance degradation to 35,000
feet (10,668 meters)
Shock Meets Bellcore Zone 4 earthquake
requirements (MIL-STD-810)
Table 5. AC Power Requirements
Parameter Specifications
Power Supply 100–240 VAC 50/60 Hz
Maximum Current Draw Per System
0.84 Amps @ 91 Watts/110 Vac
0.40 Amps @ 88 Watts/220 Vac
Maximum Power Consumption 91 Watts @ 110 Vac, 88 Watts @ 220
Vac
Typical Power Consumption 63 Watts @ 110 Vac, 61 Watts @ 220 Vac
Reliability MTBF 355.178 hours
Technical Specifications 31