Setup Guide

Figure 6. Installing the S3048 in a Front-Rack Configuration
Attaching the Ground Cable (Optional)
The S3048–ON requires one M4x0.7 screw for attaching a ground cable to the
chassis.
To properly ground the chassis, Dell Networking recommends a 6 AWG one-hole
lug, #10 hole size, 63" spacing. The one-hole lug must be a UL-recognized, crimp-
type lug.
NOTE
: The rack installation ears are not a suitable grounding point.
CAUTION: Grounding conductors must be made of copper. Do not use
aluminum conductors.
Install the Hardware 13