Install Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- Contents
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
DIN rail installation
To install an external power adapter to DIN rails:
NOTE: This installation instruction procedure applies to the external power adapter only.
You must order the mounting supplies for this installation separately.
1. Remove the two DIN buckles and screws from the shipping box.
2. Install the EPA in the power adapter holder using Steps 1 through 3 in the Power adapter holder assembly section.
3. Fix the two DIN buckles to the bottom side of the EPA power adapter assembly using three screws for each DIN rail.
4. Snap the two DIN buckles into the DIN rails.
5. Install the AC power cable to the EPA and secure with the wire clip.
6. Bend the AC power cable 180 degrees along the holder wall and through the cable cutout.
External power adapter
47