Install Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- Contents
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
ceiling mount
One RU ReadyRails installation
Install the N3200-ON Series switch, excluding the N3208PX-ON switch, using one of the following installation instructions.
You can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole
methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount.
NOTE: You must order the ReadyRails mounting supplies for this installation separately.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
36 N3200-ON Series switch installation