Install Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- Contents
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
Notes, cautions, and warnings
NOTE: A NOTE indicates important information that helps you make better use of your product.
CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid
the problem.
WARNING: A WARNING indicates a potential for property damage, personal injury, or death.
© 2020 -2021 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries.
Other trademarks may be trademarks of their respective owners.