Install Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- Contents
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
1. Luggage tag 2. 10GBASE-T RJ45 with 802.3bt Type-4 (90W) PoE
3. RJ45 serial management port 4. RJ45 Ethernet console port
5. USB Type-A port 6. Stack ID
7. MicroUSB Type-B port 8. Status LEDs
9. 10G SFP28 ports
N3248TE-ON I/O-side view
1. Luggage tag 2. 1GBASE-T RJ45
3. RJ45 serial management port 4. RJ45 Ethernet console port
5. USB Type-A port 6. Stack ID
7. MicroUSB Type-B port 8. Status LEDs
9. 10G SFP28 ports
N3248P-ON I/O-side view
1.
Luggage tag 2. 1GBASE-T RJ45 with 802.3at Type-2 (30W) PoE
3. RJ45 serial management port 4. RJ45 Ethernet console port
5. USB Type-A port 6. Stack ID
7. MicroUSB Type-B port 8. Status LEDs
9. 10G SFP+ ports
N3248X-ON I/O-side view
N3200-ON Series switch
11