Install Guide
Table Of Contents
- Dell EMC PowerSwitch N2200-ON Series Installation Guide
- Contents
- About this guide
- N2200-ON Series switch
- Site preparations
- N2200-ON Series switch installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
Connect the EPS shelf
NOTE: For more information about the external power supply (EPS), see External Power Supply (EPS) Installation for the
Dell EMC PowerSwitch N2200-ON and N3200-ON Series Switches at www.dell.com/support.
NOTE: The EPS power cable supports a maximum of 2400 W. If you require more power than 2400 W, you must connect
two EPS power cables.
To connect the EPS shelf to the switch, use the EPS power cable.
1. Unscrew the DC power cover from the rear of the switch.
NOTE: If you are connecting a single EPS power cable to your switch, always use primary A-slot. Leave the secondary
B-slot DC power cover in place, as shown:
2. Unscrew the DC-power-OUT cover from the rear of the EPS shelf.
NOTE:
If you are connecting a single EPS power cable to your MPS-3S shelf, always use primary A-slot. Leave the
secondary B-slot DC power cover in place.
MPS-1S shelf
Power supply
41