Install Guide
Table Of Contents
- Dell EMC PowerSwitch N2200-ON Series Installation Guide
- Contents
- About this guide
- N2200-ON Series switch
- Site preparations
- N2200-ON Series switch installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.
Center-mount ReadyRail installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
N2200-ON Series switch installation
29