Install Guide
Wall mount
ceiling mount
One RU ReadyRails installation
Install the N2200-ON Series switch using one of the following installation instructions. You can install the ReadyRails system
using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation
methods include two-post flush mount, two-post center mount, or four-post threaded mount.
NOTE: You must order the ReadyRails mounting supplies for this installation separately.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
26 N2200-ON Series switch installation