Setup Guide

Template Last Updated - 2/7/2007 Installation 13
DELL CONFIDENTIAL – PRELIMINARY 1/16/14 - FOR PROOF ONLY
3
Installation
Site Preparation
Before installing the switch or switches, make sure that the chosen
installation location meets the following site requirements:
Clearance — There is adequate front and rear clearance for operator
access. Allow clearance for cabling, power connections, and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise, such
as radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
Ambient Temperature — The ambient switch operating temperature
range is 10° to 35ºC (50° to 95ºF).
NOTE: Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above
900 m (2955 ft.).
Relative Humidity — The operating relative humidity is 8% to 85% (non-
condensing) with a maximum humidity gradation of 10% per hour.
Unpacking the Switch
Package Contents
When unpacking each switch, make sure that the following items are
included:
One VRTX switch module
One USB type A-to-DB-9 female cable
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement