Owners Manual
Table Of Contents
- Dell EMC PowerEdge MX750c Installation and Service Manual
- Contents
- About this document
- Dell EMC PowerEdge MX750c system overview
- Initial system setup and configuration
- Minimum to POST and system management configuration validation
- Installing and removing system components
- Safety instructions
- Before working inside your system
- After working inside your system
- Recommended tools
- PowerEdge MX750c sled
- Sled cover
- Air shroud
- Processor and memory module blank
- Drives
- Drive backplane
- Cable routing
- Drive cage
- Control panel
- System memory
- Processor and heat sink module
- PERC card
- Optional IDSDM module
- M.2 BOSS card
- Mezzanine cards
- Optional internal USB memory key
- System battery
- System board
- Trusted Platform Module
- Upgrade Kits
- Jumpers and connectors
- System diagnostics and indicator codes
- Getting help
- Documentation resources
Figure 12. Installing the I/O connector cover on sled
NOTE: The color of the I/O connector cover may differ.
CAUTION: If you are permanently removing the sled, install a sled blank promptly. Operating the enclosure
without a blank, for an extended time can result in overheating or performance loss.
Next steps
1. Install the sled.
Installing the sled into enclosure
Prerequisites
1. Follow the safety guidelines listed in Safety instructions.
CAUTION: To prevent damage to the I/O connectors, do not touch the connectors or the connector pins.
Steps
1. Remove the I/O connector cover from the I/O connector(s) and store for future use.
CAUTION:
To protect the I/O connector pins, install the I/O connector cover every time a sled is removed
from the enclosure.
24 Installing and removing system components