Owners Manual

Table Of Contents
Before working inside your system
Prerequisites
Follow the safety guidelines listed in the Safety instructions.
Steps
1. Power off the sled.
2. Remove the sled from the enclosure.
3. If applicable install the I/O connector cover.
CAUTION: To prevent damage to the I/O connectors on the system, ensure that you cover the connectors
when you remove the system from the enclosure.
4. Remove the system cover.
After working inside your system
Prerequisites
Follow the safety guidelines listed in Safety instructions.
Steps
1. If applicable, remove the I/O connector cover from the system connectors. Install the sled into the enclosure.
2. Reconnect the peripherals and connect the system to the electrical outlet, and then power on the system.
Recommended tools
You need the following tools to perform the removal and installation procedures:
Phillips #1 screwdriver
Phillips #2 screwdriver
Torx #T30 screwdriver
5 mm hex nut screwdriver
Plastic scribe
1/4-inch flat blade screwdriver
Wrist grounding strap connected to the ground
ESD mat
PowerEdge MX750c sled
The PowerEdge MX750c sled is a server unit that is installed into the PowerEdge MX7000 enclosure.
Removing the sled from enclosure
Prerequisites
1. Follow the safety guidelines listed in Safety Instructions.
2. Power off the sled.
Steps
1. Press the blue release button on the sled to release the sled handle.
2. Holding the sled handle, slide the sled out of the enclosure.
22
Installing and removing system components