Owners Manual

Table Of Contents
Table 11. Configuration 3: R1b (continued)
Card type Slot priority Maximum number of cards
Dell BOSS M.2 Module Integrated slot 1
Table 12. Configuration 4: R1b+R2b
Card type Slot priority Maximum number of cards
Broadcom (NIC: 25G) 2 2
Broadcom (NIC: 10G) 2 2
Intel (NIC: 10G) 2 2
Broadcom (NIC: 25G) 2 2
Intel (NIC: 1G) 2 2
Mellanox (NIC: 100Gb) 1 2
Intel (NIC: 25Gb) 2 2
Mellanox (NIC: 25Gb) 2 2
SolarFlare (NIC: 25Gb) 2 2
Mellanox (NIC: HDR100 VPI) 2 2
Mellanox (NIC: HDR VPI) 2 2
Intel (OCP: 100Gb) Integrated slot 1
Broadcom (OCP: 25Gb) Integrated slot 1
Intel (OCP: 25Gb) Integrated slot 1
Marvell (OCP: 25Gb) Integrated slot 1
Mellanox (OCP: 25Gb) Integrated slot 1
QLogic (OCP: 25Gb) Integrated slot 1
Broadcom (OCP: 10Gb) Integrated slot 1
QLogic (OCP: 10Gb) Integrated slot 1
Intel (OCP: 10Gb) Integrated slot 1
Broadcom (OCP: 1Gb) Integrated slot 1
Intel (OCP: 1Gb) Integrated slot 1
Dell BOSS M.2 Module Integrated slot 1
Intel (PCIe SSD AIC) 2 1
Samsung (PCIe SSD AIC) 2 1
Nvidia (GPU: T4 16 GB) 2 1
Removing the expansion card riser 1
Prerequisites
NOTE:
Install an expansion card filler bracket over an empty expansion slot to maintain Federal Communications
Commission (FCC) certification of the system. The brackets also keep dust and dirt out of the system and aid in proper
cooling and airflow inside the system.
1. Follow the safety guidelines listed in Safety instructions.
2. Follow the procedure listed in Before working inside your system.
3. Remove the air shroud.
36
Installing and removing system components