Setup Guide

Rack Installation Guide 1-19
Recommended Tools and Supplies
You need the following tools and supplies to install the system in a two-post
open-frame relay rack:
#2 Phillips screwdriver
11/32-inch wrench or nut driver (if changing to a flush-mount configuration)
Masking tape or felt-tip pen to mark the mounting holes
Rack Kit Contents
The two-post rack kit includes the following items (see Figure 1-12):
One pair of slide assemblies (two-post)
One stiffening bracket
One cable-management arm
One status indicator cable
Twelve 12-24 x 0.5-inch pan-head Phillips screws
Tie-wraps (not shown in Figure 1-12)
Figure 1-12. Two-Post Rack Kit Components
slide assemblies (2)
cable-management arm
status indicator cable
stiffening
bracket
12-24 x 0.5-inch pan-head
Phillips screw (12)