Verify that the following tasks have been completed for your cluster:
All hardware is installed in the rack.
All hardware interconnections are configured as shown in Figure 1-1 and listed in Table 1-4.
All logical unit numbers (LUNs), RAID groups, and storage groups are created on the Dell | EMC
Fibre Channel storage system.
Storage groups are assigned to the cluster nodes.
NOTICE: Before you perform the procedures in the following sections, ensure that the system hardware and cable
connections are installed correctly.
Fibre Channel Hardware and Software Configurations
Each node must include the following minimum hardware peripheral components:
One or two hard drives (73-GB minimum) in the internal hard-drive bay
Three Gigabit NIC ports
Two HBAs
Table 1-4. Fibre Channel Hardware Interconnections
Cluster Component Connections
Each PowerEdge system node One CAT 5e/6 cable from public NIC to LAN
One CAT 5e/6 cable from private Gigabit NIC to Gigabit Ethernet switch
One CAT 5e/6 cable from redundant private Gigabit NIC to redundant
Gigabit Ethernet switch
One optical cable from optical HBA 0 to Fibre Channel switch 0 and one
optical cable from HBA 1 to switch 1
Each Dell|EMC Fibre
Channel storage system
Two CAT 5e/6 cables connected to LAN
One to four optical connections to each Fibre Channel switch in a SAN-
attached or direct-attached configuration
See "Cabling Your Storage System for a SAN-Attached Configuration" for
more information.
Each Dell|EMC Fibre
Channel switch
One to four optical connections to the Dell | EMC Fibre Channel storage
system
One optical connection to each PowerEdge system’s HBA
Each Gigabit Ethernet switch One Cat 5e/6 connection to the private Gigabit NIC on each PowerEdge
system
One Cat 5e/6 connection to another Gigabit Ethernet switch