Reference Guide

Table Of Contents
JCP025
Message Lifecycle Controller is not enabled.
Detailed
Description
Lifecycle Controller must be enabled to perform the requested operation. Lifecycle
Controller can be enabled in the F2 Setup application or through a remote
operation.
Recommended
Response Action
If Lifecycle Controller is in Recovery mode a firmware update of Lifecycle
Controller may be required. To change the Lifecycle Controller mode, do the
following: 1) Restart the system and press F2 to launch the System Setup
application 2) Select iDRAC Configuration 3) Select Lifecycle Controller Settings to
enable Lifecycle Controller.
Category Configuration (JCP = Job Control)
Severity Severity 3 (Informational)
No alerts are applicable for this message
JCP026
Message Update packages are being downloaded. This job resumes when the downloads
are completed.
Detailed
Description
Update packages are being downloaded for other jobs initiated on this system. This
job resumes when the downloads complete.
Recommended
Response Action
No response action is required.
Category Configuration (JCP = Job Control)
Severity Severity 3 (Informational)
No alerts are applicable for this message
JCP027
Message Job created successfully.
Detailed
Description
An install or configuration job is successfully created on iDRAC.
Recommended
Response Action
No response action is required.
Category Configuration (JCP = Job Control)
Severity Severity 3 (Informational)
Trap/EventID 10267
694