Reference Guide

Table Of Contents
Filter
Visibility
IPMI
Alert
SNMP
Alert
Email
Alert
Remote System
Log
WS
Eventing
iDRAC
CMC
LC Log LCD OS Log Power
Off
Power
Cycle
Reset Chassis Event
Proxy
iDRAC
CMC
PWR2250
Message Unable to turn on the server because the chassis infrastructure not ready.
Detailed
Description
The server did not turn on because the chassis infrastructure is not ready. The
chassis infrastructure includes: PCIe subsystem, storage components, and the
chassis management controller.
Recommended
Response Action
Check the status of the chassis infrastructure in the CMC Web or RACADM
interface. Wait until the chassis infrastructure components are fully turned on.
Category Audit (PWR = Power Usage)
Severity Severity 2 (Warning)
Filter
Visibility
IPMI
Alert
SNMP
Alert
Email
Alert
Remote System
Log
WS
Eventing
iDRAC
CMC
LC Log LCD OS Log Power
Off
Power
Cycle
Reset Chassis Event
Proxy
iDRAC *
CMC
PWR2251
Message Unable to turn on the server because the chassis cover is open.
Detailed
Description
The server did not turn on because the chassis cover is open.
Recommended
Response Action
Close the chassis cover and retry the operation.
Category Audit (PWR = Power Usage)
Severity Severity 2 (Warning)
1124