Reference Guide

PWR8523
Message Completed chassis power cycle operation.
Detailed
Description
The chassis power cycle operation was completed.
Recommended
Response
Action
No response action is required.
Category Audit (PWR = Power Usage)
Severity Severity 3 (Informational)
Filter
Visibility
IPMI
Alert
SNMP
Alert
Email
Alert
Remote System
Log
WS
Eventing
iDRAC *
CMC *
LC Log LCD OS Log Power
Off
Power
Cycle
Reset Chassis Event
Proxy
iDRAC *
CMC * *
PWR8524
Message Redundancy was lost, while Server Performance Over Power Redundancy is
enabled.
Detailed
Description
The redundancy was lost because the power requirement of the chassis exceeds
the current redundant policy.
Recommended
Response
Action
No response action is required. Review the power requirements and determine if
more PSUs are needed to restore redundancy.
Category Audit (PWR = Power Usage)
Severity Severity 3 (Informational)
Filter
Visibility
IPMI
Alert
SNMP
Alert
Email
Alert
Remote System
Log
WS
Eventing
iDRAC
CMC
1165