Reference Guide

PR23
Message Job is ready for execution.
Detailed
Description
The specified job is ready to start. It is waiting for scheduling from job control. This message is
no longer in use in Lifecycle Controller 2.0 as the job control functionality handles this
operation.
Recommended
Response Action
No response action is required.
Category Configuration
SubCategory PR = Part Exchange
Severity Severity 3 (Informational)
Trap/EventID FALSE
LCD Message No LCD message display defined.
Initial Default. FALSE
Filter
Visibility
IPMI Alert SNMP
Alert
Email
Alert
LC Log LCD Power Off Power
Cycle
Reset
FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE
PR24
Message Job cancelled.
Detailed
Description
The specified job was cancelled. This could be due to user action or system error. This
message is no longer in use in Lifecycle Controller 2.0 as the job control functionality handles
this operation.
Recommended
Response Action
No response action is required.
Category Configuration
SubCategory PR = Part Exchange
Severity Severity 3 (Informational)
Trap/EventID FALSE
LCD Message No LCD message display defined.
Initial Default. FALSE
Filter
Visibility
IPMI Alert SNMP
Alert
Email
Alert
LC Log LCD Power Off Power
Cycle
Reset
FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE
700