Release Notes

Issue 2
Description
View slot occupancy report shows 4 HDD slots on backplanes with just 2 HDD slots for any server.
Issue 3
Description
Physical disk clear operation is not available on PERC 8 family of controllers.
Issue 4 DF489665
: Max Config: OM on ESXi 4.1 U2 Experiences Timeouts and very poor performance
Description
When using ESXi with a large number of directly attached disk drives, delays or timeouts in OpenManage Storage Manager
may be encountered during VD creation. PowerEdge servers support up to 2 RAID controllers. Each array controller supports
up to 8 MD1200/1220 enclosures. In the case of OMSA 7.0 and earlier with ESXi, max direct attach storage configs will
timeout during VD creation. To create a VD using ESXi it could take up to 12 minutes to successfully build the xml output for
up to 200 drives. If more than 200 drives are present in the direct attach enclosures you may encounter a timeout error
during VD creation. "The action performed has failed."
Resolution
Improvements are being investigated for the OM7.1 timeframe in Q1 of 2012.Until then the number of direct attached
drives will need to be reduced to below 200 if the timeout is encountered. Please allow sufficient time for the VD to be
created.
Issue 5
Description
Physical disk properties such as Manufacture day, Manufacture week and Manufacture year are available for the SAS drives
only.
Issue 6
Description
Dell OpenManage Server Administrator Storage Management 7.0 does not support PERC 4 controllers and earlier versions on
ESXi 4.x, ESXi 5.x, ESX 4.x and all 64 bit Linux Operating System.
Issue 7
Description
Hot removal of enclosure is not supported in Storage Management. It may result in unpredictable errors, such as stopping
Storage Management service.
Issue 8
: Creating many sliced span virtual disks using the spun-down drives through the command line or GUI result may be
delayed.
Resolution
After creating one sliced span virtual disk, wait for some time to create the next sliced span virtual disk.