Setup Guide
Table Of Contents
Introduction
The OpenManage Management Pack for vRealize Operations Manager enables you to monitor the health status and analyze
important metrics of the Dell EMC PowerEdge servers and chassis that are managed by OpenManage Integration for VMware
vCenter (OMIVV) 4.0 or later.
Topics:
• Pre-requisites
• Support Matrix
Pre-requisites
Following are the requirements to install OpenManage Management Pack for vRealize Operations Manager:
● A compatible version of the OpenManage Integration for VMware vCenter and vRealize Operations are required (see table
1).
● Ensure that you have an OMIVV license to manage the Dell EMC hosts. For more information about the OMIVV license, see
OpenManage Integration for VMware vCenter Quick Installation Guide for vSphere Web Client.
● Ensure that the vROPS configuration is set to Extralarge(6.5 and above), if more than 500 servers are managed.
NOTE:
If the OMIVV is managing many servers (>100), Dell EMC recommends setting the Collection Interval
(minutes) to 45 at vROPS.
● Ensure that the hosts are part of the connection host credential profile of Dell EMC OMIVV to manage them using Dell EMC
management pack.
Support Matrix
Table 1. Support Matrix
OpenManage Management Pack for
vRealize Operations Manager Version
Required OpenManage Integration
for VMware vCenter versions
Supported vRealize Operations
Manager versions
1.0 4.0 6.3, 6.4
1.1 4.0, 4.1, 4.2 6.3, 6.4, 6.5, 6.6
1.2 4.2, 4.3 6.5, 6.6, 6.7, 7.0
2.0 5.0 6.7, 7.0, 7.5
NOTE: Refer the OMIVV document for supported PowerEdge , Chassis, and supported Firmware version. For information
about supported PowerEdge servers, see OMIVV compatibility matrix at
dell.com/support
1
4 Introduction