Users Guide

Table Of Contents
View Hardware symmetry check results
After the Hardware symmetry check has completed, the summary report is displayed. All rules must pass with a green check
mark, or in some cases, a yellow triangle (warning). The following table shows the symbols in the summary and explains what
they mean:
Symbols Description
The Hardware symmetry check passed, indicating that this
aspect of nodes configuration is supported for the cluster
deployment.
The Hardware symmetry check produced a warning, indicating
that this aspect of nodes configuration can be supported for
cluster deployment, but might result in sub-optimal cluster
performance. Therefore, it should be reviewed.
The Hardware symmetry check failed, and this aspect of
nodes configuration is not supported. You must correct the
issue before you can deploy an symmetric Azure Stack HCI
cluster.
32 Integrated deploy and update of Azure Stack HCI clusters