Install Guide
Table Of Contents
- Dell EMC VEP4600 Installation Guide
- About this guide
- VEP4600 platform
- Site preparations
- VEP4600 installation
- Power supplies
- Fans
- Management ports
- Specifications
- Chassis physical design
- IEEE standards
- Safety standards and compliance agency certifications
- Product recycling and disposal
- Agency compliance
- USA Federal Communications Commission statement
- Industry Canada Statement
- Brazil – Aviso da Anatel
- European Union EMC directive conformance statement
- Japan VCCI compliance for class A equipment
- Korean certification of compliance
- Mexico certification of compliance
- Taiwanese certification of compliance
- Thailand certification of compliance
- Singapore certification of compliance
- Dell EMC support
Figure 14. Platform four-post front installed
5. Align the rear rack rails to the front rail and slide into place.
Figure 15. Rear platform rail
About three inches before you fully insert your platform, the rail locking feature engages to keep the platform from
inadvertently sliding out and falling.
NOTE: Screw the rear rails into rear rack posts to secure them.
Figure 16. Platform four-post rear installed
To remove the platform, unscrew the rack-mounting screws and slide the platform forward.
Optics installation
The VEP4600 has SFP+ optical ports.
For a list of supported optics, see the specification sheets at https://www.dell.com/support or contact your Dell EMC Sales
representative.
CAUTION:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel
ground strap when handling the VEP4600 and components.
VEP4600 installation 21