Installation guide

26 | Install the S6000
www.dell.com | support.dell.com
Configure a Four-Post Thread
Step Task
1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. To remove the
two screws from each flange ear and remove each casting, use a Torx driver. Refer to
Figure
, item 1. Retain the
castings for future rack requirements.
2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer
to
Figure
, item 2.
Figure 4-4. Four-Post Threaded Configuration