Installation guide

Install the S6000 | 21
4
Install the S6000
To install the S6000 system, Dell Networking recommends completing the installation procedures in the
order presented in this chapter.
Always handle the S6000 and its components with care. Avoid dropping the system or its field
replaceable units (FRUs).
This chapter describes the installation procedures as follows:
Unpack the S6000 System
Install Rack or Cabinet Hardware
Installing the Dell ReadyRails System
Configuring a Two-Post Flush-Mount
Configuring a Two-Post Center-Mount
Configure a Four-Post Thread
Installing the S6000 System
Installing a 1U Front-Rack
Attaching the Ground Cable
Installing an AC or DC Power Supply
Installing QSFP+ Optics
Power Up the S6000 System
WARNING: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or
heel ground strap when handling the S6000 and its components. As with all electrical devices of this type, take
all the necessary safety precautions to prevent injury when installing this system.
Unpack the S6000 System
NOTE: Before unpacking the system, inspect the container and immediately report any evidence of damage.
Package Contents
When unpacking each S6000 system, make sure that the following items are included:
One S6000 system
One RJ-45 to DB-9 female cable
Two sets of rail kits (no tools required)
Two PSUs