Installation guide
Site Location and Preparation | 17
3
Site Location and Preparation
The S6000 is suitable for installation as part of a common bond network (CBN). It can be installed in:
• Network telecommunication facilities
• Data centers
• Other locations where the national electric code (NEC) applies
This chapter contains the following sections regarding where and how you should install the S6000:
• Site Selection
• Cabinet Placement
• Rack Mount
• Ground
• Fans and Airflow
• Power
• Storing Components
NOTE: Install the S6000 system into a rack or cabinet before installing any optional components.