Setup Guide

4 To remove each rail, pull on the latch release button on each flange ear and unseat each rail. See item 3 in the following
illustration.
Figure 25. 1U Tool-Less Configuration
Configuring a Two-Post Flush-Mount
To install your switch using a two-post flush-mount configuration, follow these steps.
1 For this configuration, remove the castings from the front side of each ReadyRails assembly. See item 1 in the following
illustration. To remove the two screws from each front flange ear (on the switch side of the rail) and remove each casting,
use a Torx driver. Retain the castings for future rack requirements. It is not necessary to remove the rear flange castings.
2 Attach one rail to the front post flange with two user-supplied screws. See item 2 in the following illustration.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-
supplied screws. See item 3 in the following illustration.
Install a S3100 Series System 35