Owner's Manual

Using Dell Lifecycle Controller Integration (DLCI) 43
The pre-operating system image is mounted as a virtual media over the
network and the drivers for the target host operating system are applied
either from the ConfigMgr console repository or the Lifecycle Controller.
If you select drivers from the Lifecycle Controller, the list of operating
systems supported is based on the current driver pack flashed on the iDRAC.
You can also download an ISO image to the vFlash SD card on the target
system and boot the system to the downloaded ISO image.
NOTE: vFlash features can only be used on rack and tower servers with iDRAC
version 1.3 firmware or newer, or on blade servers with iDRAC version 2.2 or newer.
For more information on remote operating system deployment and staging
and booting to operating system image on vFlash, see the Dell Lifecycle
Controller User Guide at support.dell.com/manuals.
To deploy the operating system to a collection:
1
From the ConfigMgr console, under
Computer Management
Collections
,
right-click on
Managed Dell Lifecycle Controllers (OS
Unknown)
and select
Dell Lifecycle Controller
Launch Config Utility
.
2
From the Dell Lifecycle Controller Configuration Utility, select
Deploy
Operating System
. This task consists of five steps which you must
complete to configure the collection of servers and reboot to WinPE. The
steps are as follows:
a
Select
Update Firmware from a Dell Repository
if you want to update
the Firmware on the collection. For more information, see Updating
Firmware During OS Deployment.
b
Select
Configure Hardware
if you want to make changes to the
hardware settings. For more information, see Configuring Hardware
During OS Deployment.
c
Select
Configure RAID
to configure RAID on the servers. For more
information, see Configuring RAID.
d
Select the advertisement to advertise the task sequence to the
collection, and the operating system to be deployed on the collection.
DLCI_UserGuide.book Page 43 Wednesday, February 2, 2011 10:49 AM