Web Services Interface Guide
296 Dell Lifecycle Controller Web Services Interface Guide for Windows
application
LCStatus
1. Ready
Lifecycle Controller
instrumentation is up to date
and enabled
2. (Not Initialized)
Lifecycle Controller
instrumentation is not
initialized. The initialization
operation may take up
to a minute.
3. (Reloading Data)
Lifecycle Controller
instrumentation is currently
refreshing its cache because
of a recent
configuration change. The
reloading operation
typically takes few seconds
and could take up to few
minutes to complete.
4. (Disabled)
Lifecycle Controller is disabled
on the server.
Lifecycle Controller can be
enabled thru Remote
Services or F2 iDRAC
configuration.
5. (In Recovery)
Lifecycle Controller is in
Recovery mode. Refer to
iDRAC users guide on
instructions on how to repair
Lifecycle Controller.
6. (In Use)
Lifecycle Controller is being
currently used by
another process.
20.2 Restarting Remote Service Status
If you continue to get “Not Ready” remote service status, invoke the DeleteJobQueue() method with
JID_CLEARALL job id to restart the remote service [LC1.5.x ONLY].
EXAMPLE:
winrm invoke DeleteJobQueue cimv2/root/dcim/DCIM_JobService
?CreationClassName=DCIM_JobService
+Name=JobService