Release Notes

Issue 2
Description
After running a BIOS or NIC job, if you pause (by pressing Pause key on keyboard) during POST and run another BIOS or NIC
job, it fails.
Versions/Systems Affected
All LC2-RS supported Dell PowerEdge systems.
Issue 3
Description
While performing platform update using the NFS share option, if the NFS service is stopped or network connection to the
NFS share is lost while the job is in a downloading state, the job does not fail and continues to stay in a downloading state.
Resolution
To change the job status to:
Downloaded successfully - Restart the NFS service or re-establish the network connection.
Failed - Reset iDRAC7.
Versions/Systems Affected
All LC2-RS supported Dell PowerEdge systems.
Issue 4
Description
When two PSUs of same wattage and make are replaced and Part Replacement (Allow Version Upgrade only or Match
firmware of replacement part option) feature is enabled, during platform update, the following behavior is observed:
After the first PSU firmware update is complete, the Lifecycle log shows that both the PSUs are updated even though the
firmware update for the second PSU is in progress. After the second PSU firmware update is complete, the Lifecycle log is
not updated again.
Resolution
Query the job status using the job ID for the second PSU to get the correct status.
Versions/Systems Affected
All LC2-RS supported Dell PowerEdge systems.
Issue 5
Description
LC-Remote Services jobs may fail occasionally to perform the required operations (either due to manual intervention or
system failure) and the user cannot create a new job on the same component.