Reference Guide
Model Dell Latitude 7000 Series
• METHOD 502.5 LOW TEMPERATURE Procedure I
(Exaggerated)
• METHOD 502.5 LOW TEMPERATURE Procedure II
• METHOD 507.5 Procedure II Humidity Aggravated Cycle
• METHOD 510.5 SAND AND DUST Procedure I
• IP5x Dust Ingress Duration: 8 hours
• METHOD 514.6 VIBRATION Procedure I
• Method 516.6 SHOCK Procedure I: Functional Shock
• Method 516.6 SHOCK Procedure IV: Transit Drop; Modied to
be dropped at 30
• Method 516.5 SHOCK Procedure II: Material to be Packaged
• Method 516.5 SHOCK Procedure V: Crash Hazard Shock
• Method 516.6 SHOCK Procedure VI: Bench Handling
58 Engineering specications










