Users Guide
To import the server conguration prole from the USB device to iDRAC:
1 Congure the USB management port:
• Set USB Management Port Mode to Automatic or iDRAC.
• Set iDRAC Managed: USB XML Conguration to Enabled with default credentials or Enabled.
2 Insert the USB key (that has the conguration.xml and the control.xml le) to the iDRAC USB port.
3 The server conguration prole is discovered on the USB device in the System_Conguration_XML sub-directory under the USB
device root directory. It is discovered in the following sequence:
• <servicetag>-cong.xml
• <modelnum>-cong.xml
• cong.xml
4 A server conguration prole import job starts.
If the prole is not discovered, then the operation stops.
If iDRAC Managed: USB XML Conguration was set to Enabled with default credentials and the BIOS setup password is not null or
if one of the iDRAC user accounts have been modied, an error message is displayed and the operation stops.
5 LCD panel and LED (if present) display the status that an import job has started.
6 If there is a conguration that needs to be staged and the Shut Down Type is specied as No Reboot is specied in the control le,
then you must reboot the server for the settings to be congured. Else, server is rebooted and the conguration is applied. Only when
the server was already powered down, then the staged conguration is applied even if the No Reboot option is specied.
7 After the import job is complete, the LCD/LED indicates that the job is complete. If a reboot is required, LCD displays the job status as
“Paused waiting on reboot”.
8 If the USB device is left inserted on the server, the result of the import operation is recorded in the results.xml le in the USB device.
LCD messages
If the LCD panel is available, it displays the following messages in a sequence:
1 Importing – When the server conguration prole is being copied from the USB device.
2 Applying — When the job is in-progress.
3 Completed — When the job has completed successfully.
4 Completed with errors — When the job has completed with errors.
5 Failed — When the job has failed.
For more details, see the results le on the USB device.
LED blinking behavior
If the USB LED is present, it indicates the following:
• Solid green – When the server conguration prole is being copied from the USB device.
• Blinking green – When the job is in-progress.
• Solid green – When the job has completed successfully.
Logs and results le
The following information is logged for the import operation:
• Automatic import from USB is logged in the Lifecycle Controller log le.
• If the USB device is left inserted, the job results are recorded in the Results le located in the USB key.
294
Using USB port for server management