Deployment Guide
Table Of Contents
- 1 Introduction
- 2 The Dell FX2 and FN I/O Modules
- 3 Initial out-of-box connectivity check and default settings
- 4 VLT and the example environments
- 5 FN IOM Dell Blade I/O manager and internal port mapping features
- 6 Environment One: Basic VLT deployment with VLT mode
- 7 Environment Two: Dell Networking switches with mVLT and IOM in Full Switch mode
- 8 Environment Three: Dell Networking switches with mVLT and FN IOM in programmable MUX mode.
- 9 Environment Four: VLT interoperability with Cisco vPC
- A References
- B Components
- C Terminology
- D Reset FN IOM to Default Factory Configuration
- E FN IOM initial out-of-box configuration and default settings
- F Support and feedback

4 PowerEdge FX2 – FN I/O Module – VLT Deployment Guide | Version 2.2
9.2 Environment Four: Cisco Nexus 5000 Series vPC configuration ..................................................................... 76
9.3 Environment Four: Verify VLT connectivity ...................................................................................................... 83
9.4 Environment Four: Verify VPC connectivity ..................................................................................................... 84
A References ................................................................................................................................................................. 90
B Components ............................................................................................................................................................... 90
C Terminology ................................................................................................................................................................ 91
D Reset FN IOM to Default Factory Configuration ........................................................................................................ 94
E FN IOM initial out-of-box configuration and default settings .................................................................................... 100
E.1 Configure interfaces and the port channel on the upstream switch ............................................................... 101
E.2 Verify the configuration ................................................................................................................................... 104
F Support and feedback .............................................................................................................................................. 106