Owners Manual
Figure 36. Installing the mezzanine card bridge board
Next steps
1 Install the mezzanine card.
2 Install the expansion card riser assembly.
3 Install the sled into the enclosure.
4 Follow the procedure listed in After working inside your system.
Removing the OCP card
Prerequisites
NOTE
: The procedure to remove the mezzanine blank is similar to the removal of a mezzanine card.
1 Follow the safety guidelines listed in Safety instructions.
2 Follow the procedure listed in Before working inside your system.
3 Remove the sled from the enclosure.
4 Remove the mezzanine card.
Steps
1 Push the blue retention clips away on one side and release the Open Compute Project (OCP) card.
Repeat step 1 to release the card from the clips on the other side.
2 Slide the card toward the front of the sled to disengage the connectors from the chassis and lift the card up.
82
Installing and removing system components