Install Guide

Edge 3000 Series installation
To install the Edge 3000 Series platform, complete the installation procedures in the order that is presented in this chapter.
Always handle the platform and components with care. Avoid dropping the platform or its field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the platform and components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this platform.
Topics:
Unpack
Ground lug
Rack or cabinet hardware installation
Two-post installation
Four-post installation
Optics installation
Platform power-up
Unpack
NOTE:
Before unpacking the platform, inspect the container and immediately report any evidence of damage.
When unpacking the platform, ensure that the following items are included:
One Edge 3000 Series platform
One RJ-45 to DB-9 female cable
Two-post rail kit; no tools required
One or two country- or region-specific AC power cables, depending on the configuration
Dell EMC SD-WAN Edge 3000 Series Quick Start Guide
Safety and Regulatory Information
Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the platform from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
Ground lug
Dell EMC recommends you ground your Edge 3000 Series platform; however, grounding is optional and the ground lug assembly kit is not
included with the platform. The ground lug must be a UL-recognized, crimp-type lug. To order a UL-certified ground lug with bracket,
contact your Dell EMC sales representative.
NOTE:
The ground cable and lug are not included with the platform.
NOTE: For AC-powered platform although the third conductor of the AC power cable provides a ground path, Dell EMC
recommends grounding your platform with a dedicated ground wire.
To attach a ground lug assembly to the platform, use the included two M3 ground lug bracket screws. The platform ships with the M3
ground lug bracket screws attached.
CAUTION:
Grounding conductors
must
be made of copper. Do not use aluminum conductors.
4
14 Edge 3000 Series installation