Owners Manual
Table Of Contents
- Dell EMC PowerVault ME4 Series Storage System Owner’s Manual
- Contents
- Storage system hardware
- Troubleshooting and problem solving
- Module removal and replacement
- ESD precautions
- Dealing with hardware faults
- Firmware updates
- Continuous operation during replacement
- Shutting down attached hosts
- Shutting down a controller module
- Verifying component failure
- Customer-replaceable units (CRUs)
- Attach or remove the front bezel of a 2U enclosure
- Replacing a drive carrier module in a 2U enclosure
- Replacing a DDIC in a 5U enclosure
- Replacing a controller module or IOM in a 2U or 5U enclosure
- Replacing a power supply unit (PSU) in a 5U enclosure
- Replacing a fan cooling module (FCM) in a 5U enclosure
- Replacing a power cooling module (PCM) in a 2U enclosure
- Completing the component installation process
- Verifying component operation
- Performing updates in PowerVault Manager after replacing an FC or SAS HBA
- Events and event messages
- Connecting to the CLI port using a serial cable
- Technical specifications
- Standards and regulations
Figure 5. 5U84 enclosure system—front orientation
The 5U84 controller enclosure is equipped with dual-controllers.
Figure 6. 5U84 enclosure system—rear orientation
Attach or remove the front bezel of a 2U enclosure
The following figure shows a partial view of a 2U12 enclosure:
Figure 7. Attaching or removing the 2U enclosure front bezel
To attach the front bezel to the 2U enclosure:
1. Locate the bezel, and while grasping it with your hands, face the front panel of the 2U12 or 2U24 enclosure.
2. Hook the right end of the bezel onto the right ear cover of the storage system.
3. Insert the left end of the bezel into the securing slot until the release latch snaps in place.
4. Secure the bezel with the keylock as shown in Attaching or removing the 2U enclosure front bezel.
To remove the bezel from the 2U enclosure, reverse the order of the preceding steps.